AUSSCHLIESSLICH FÜR LAST-MILE-LOGISTIKBETREIBER

KI-gestützte Flottensicherheit, die dasFahrverhalten verbessert, Zwischenfälle reduziert und Flottenmanagern klareoperative Einblicke verschafft.

Vehicle tracking, fleet maintenance, fuel insights, GPS, and 
ELD compliance. Boost fleet operations and profits without
sacrificing safety.

One platform for vehicle tracking. ELD, fuel, maintenance, GPS, and DVIRs.

99% Al accuracy. Stop chasing false positives.

Positive driver coaching that rewards good driving, only from Netradyne.

Trusted by 250K+ vehicles across every major fleet vertical.

SEE IT ON YOUR FLEET

Book your live demo.

A 25-minute walkthrough on your real routes, vehicles, and risk profile. No slide deck.

Marktführer setzen auf uns

DHL Express Logo
Picnic Logo
Rhenus Logistics Logo
Cool Blue Logo
DHL Express Logo
Picnic Logo
Rhenus Logistics Logo
Cool Blue Logo
Built for fleets.

Always on. Operating at scale.

~99%*

Accuracy of alerts. False positives kill adoption. We don’t have them.

100%

Of drive time analyzed. The whole shift, not just the bad moments.

25B+

Driving miles analyzed. The largest dataset in commercial AI vision.

250K+

Devices deployed globally across every major fleet vertical.

Recognized Awards & accolades

The industry agrees.

Better road safety is thanks enough, but the awards are nice too.

Forbes America's Best Startup Employers 2023-2025

Forbes Best Startup
Employers List

2023 – 2025
Heavy Duty Trucking Top 20 Products 2026 badge with blue and yellow hexagonal design.

HDT Top 20
Products

2023 – 2026
AI Breakthrough Award 2025

AI Safety Solution
of the Year

2025
Gold 2022 Stever Winner American Business Awards

Gold Stevie®
Award

2024
ONE PLATFORM. SIX FLEET WORKFLOWS

Peak fleet performance, one dashboard.

Powered by one device, one platform, and the trusted partner already running 250,000+ vehicles.

Fuel management

Cut fuel spend with idling and behavior insights. Score drivers, coach the ones who need it, and reward the rest.

Preventative maintenance

Catch faults before they pull a vehicle off the road. Automated workflows trigger on diagnostics, idling, and MPG drift.

GPS fleet tracking

Real-time location with event video overlaid on the route. Geofences, ETAs, and client-facing share links built in.

Vehicle inspections

DVIRs drivers actually complete. Critical defects flagged, history surfaced, missed inspections caught in real time.

ELD compliance

HOS, DVIR, and IFTA on the same device that runs your safety program. One audit trail, one bill, one vendor.

Driver coaching

GreenZone® scoring plus in-cab feedback. Drivers see their own metrics and self-correct. No manager overhead.

Driver•i® The device behind the data

One device.
The whole fleet picture.

Driver•i is the AI camera system trusted by 250,000+ vehicles. It runs safety, ELD, GPS, DVIRs, and driver coaching on a single device, with the visual context to tell you why something happened, not just that it did.
Book Demo
Dashboard view of cars on a road with warning 'Hard Braking Ahead' and time distances displayed.
.parallax-item.is-2nd:where(.w-variant-08ff6009-55d4-8837-e368-36e41c0ef82d) { inset: auto auto 4% 5%; }